RMP I-285 CCBL-OFF over I-85- 2 I-85 RAMP

2.4 MI E OF CHAMBLEE · County 089, Georgia · Built 1985 · 1 Lanes · 8,360 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008902790
Year Built
1985
Length
338.3 m (1109.9 ft)
Max Span
50 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
8,360
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,154,000
Total Project Cost
$4,731,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.