RMP US 23 TO M9265 over I-85- I-85 RAMP
2.4 MI E OF CHAMBLEE · County 089, Georgia · Built 1984 · 1 Lanes · 6,805 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.891781, -84.259972
This bridge is in worse condition than 78.3% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 42 years old.
Nearby Bridges
I-85 SBL OFF RAMP over I-85 RMP SB TO I-285 CCB
Built 1987
RMP I-285 CCBL-OFF over I-85- 2 I-85 RAMP
Built 1985
I-85 NBL OFF RAMP over I-285 RMP CB TO I-85 NB
Built 1985
I-285 CBL OFF RAMP over I-285 RMP CB FROM US 23
Built 1986
I-285 over I-85- I-85 RAMP
Built 1968
I-285 NB ON RAMP over I-285 RMP CB TO I-85 SB
Built 1987
RMP I-85N TO I-285 over I-85- I-285- 4 RAMPS
Built 1985
I-285 CCBL OFF RMP over 2 I-85 RMPS- 1 I-285 RMP
Built 1986
RMP I-285 TO I-85 over 2 I-85 RMPS-4 I-285 RMPS
Built 1987
I-85 NB OFF RAMP over SR407(US 23RMP TO M9265)
Built 1985
Bridge Details
- Structure #
- 000000008902780
- Year Built
- 1984
- Length
- 79.6 m (261.2 ft)
- Max Span
- 41.5 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 1
- Daily Traffic
- 6,805
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $742,000
- Total Project Cost
- $1,112,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.