I-85 SBL OFF RAMP over I-85 RMP SB TO I-285 CCB

2.8 MI E OF CHAMBLEE · County 089, Georgia · Built 1987 · 1 Lanes · 6,910 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008902740
Year Built
1987
Length
160 m (524.9 ft)
Max Span
52.7 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
6,910
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,492,000
Total Project Cost
$2,238,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.