RMP I-85N TO I-285 over I-85- I-285- 4 RAMPS

2.4 MI E OF CHAMBLEE · County 089, Georgia · Built 1985 · 2 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008902690
Year Built
1985
Length
528.5 m (1733.9 ft)
Max Span
68.9 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
6,805
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,775,000
Total Project Cost
$10,163,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.