RMP I-285 TO I-85 over 2 I-85 RMPS-4 I-285 RMPS

2.4 MI E OF CHAMBLEE · County 089, Georgia · Built 1987 · 2 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008902760
Year Built
1987
Length
723.3 m (2373 ft)
Max Span
69.2 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
6,805
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,272,000
Total Project Cost
$13,908,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.