I-85 NBL OFF RAMP over I-285 RMP CB TO I-85 NB

2.5 MI E OF CHAMBLEE · County 089, Georgia · Built 1985 · 1 Lanes · 11,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000008902710
Year Built
1985
Length
43 m (141.1 ft)
Max Span
43 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
11,200
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$401,000
Total Project Cost
$601,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.