I-285 CBL OFF RAMP over I-285 RMP CB FROM US 23

2.3 MI E OF CHAMBLEE · County 089, Georgia · Built 1986 · 2 Lanes · 19,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008902750
Year Built
1986
Length
94.5 m (310 ft)
Max Span
41.5 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
19,300
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,211,000
Total Project Cost
$1,817,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.