I-10 EB over MOBILE BAY * US 90
EAST TUNNEL INTERCHANGE · County 097, Alabama · Built 1978 · 2 Lanes · 32,384 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
30.686908, -88.008358
This bridge is in worse condition than 73.6% of bridges in County 097. The average bridge in Alabama is 0 years old; this one is 48 years old.
Nearby Bridges
I-10 WB over M. BAY 90 98 I10WB RAMP
Built 1978
US 90 WB over TENSAW/SPANISH RIVER
Built 1965
US 90 EB over TENSAW/SPANISH RIVER
Built 1998
US 90 over MUD CREEK
Built 1928
US 90 TO I10 WB over I-10EB * WB * WB ON RAMP
Built 1973
I-10 EB TO US 90 over US 90
Built 1973
US 90 EB TO I10 EB over US 90 EB * WB
Built 1973
I-10 WB TO US 90 over US 90
Built 1973
US 90 EB TO I10 EB over US 90
Built 1978
DUNLAP DRIVE over PINTO PASS
Built 2020
Bridge Details
- Structure #
- 011931
- Year Built
- 1978
- Length
- 12109.1 m (39728 ft)
- Max Span
- 46.9 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 32,384
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $348,732,000
- Total Project Cost
- $383,605,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.