I-10 EB over MOBILE BAY * US 90

EAST TUNNEL INTERCHANGE · County 097, Alabama · Built 1978 · 2 Lanes · 32,384 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
011931
Year Built
1978
Length
12109.1 m (39728 ft)
Max Span
46.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
32,384
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$348,732,000
Total Project Cost
$383,605,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.