I-10 WB over M. BAY 90 98 I10WB RAMP

EAST TUNNEL INTERCHANGE · County 097, Alabama · Built 1978 · 2 Lanes · 32,387 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
011930
Year Built
1978
Length
12107.6 m (39723.1 ft)
Max Span
46.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
32,387
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$348,688,000
Total Project Cost
$383,557,000