DUNLAP DRIVE over PINTO PASS
0.7 MI S JCT US 90 · County 097, Alabama · Built 2020 · 2 Lanes · 526 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.685539, -88.03135
This bridge is in worse condition than 44.3% of bridges in County 097. The average bridge in Alabama is 0 years old; this one is 6 years old.
Nearby Bridges
I-10EB TO WATER ST over ROYAL/MONROE STS
Built 1972
US 90 EB TO I10 EB over US 90 EB * WB
Built 1973
I-10 WB TO US 90 over US 90
Built 1973
I-10 EB TO US 90 over US 90
Built 1973
US 90/COCHRANE BR over MOBILE RIVER
Built 1991
WATER ST TO I10E/W over ROYAL ST
Built 1972
US 90 over US 43 * NORFOLK SOUTHERN
Built 1997
US 90 TO I10 WB over I-10EB * WB * WB ON RAMP
Built 1973
I-10WB TO WATER ST over I10-EB/WB/RAMP TO WB I10
Built 1972
I-10 EB over CANAL; JACKSON; RAMP 6
Built 1972
Bridge Details
- Structure #
- 021337
- Year Built
- 2020
- Length
- 18.3 m (60 ft)
- Max Span
- 16.9 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 526
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $785,000
- Total Project Cost
- $864,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.