I-10EB TO WATER ST over ROYAL/MONROE STS

WEST TUNNEL INTERCHANGE · County 097, Alabama · Built 1972 · 2 Lanes · 14,782 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
010666
Year Built
1972
Length
646.5 m (2121.1 ft)
Max Span
26.8 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
14,782
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,061,000
Total Project Cost
$20,967,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.