US 90 EB TO I10 EB over US 90 EB * WB
EAST TUNNEL INTERCHANGE · County 097, Alabama · Built 1973 · 1 Lanes · 4,677 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
30.691942, -88.027728
This bridge is in worse condition than 55.8% of bridges in County 097. The average bridge in Alabama is 0 years old; this one is 53 years old.
Nearby Bridges
I-10 WB TO US 90 over US 90
Built 1973
I-10 EB TO US 90 over US 90
Built 1973
US 90 TO I10 WB over I-10EB * WB * WB ON RAMP
Built 1973
DUNLAP DRIVE over PINTO PASS
Built 2020
US 90/COCHRANE BR over MOBILE RIVER
Built 1991
US 90 over US 43 * NORFOLK SOUTHERN
Built 1997
WATER ST TO I10E/W over ROYAL ST
Built 1972
I-10EB TO WATER ST over ROYAL/MONROE STS
Built 1972
I-10WB TO WATER ST over I10-EB/WB/RAMP TO WB I10
Built 1972
I-10 EB over CANAL; JACKSON; RAMP 6
Built 1972
Bridge Details
- Structure #
- 010853
- Year Built
- 1973
- Length
- 290.2 m (952.1 ft)
- Max Span
- 21.3 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 1
- Daily Traffic
- 4,677
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,571,000
- Total Project Cost
- $6,128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.