US 90 EB TO I10 EB over US 90 EB * WB

EAST TUNNEL INTERCHANGE · County 097, Alabama · Built 1973 · 1 Lanes · 4,677 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
010853
Year Built
1973
Length
290.2 m (952.1 ft)
Max Span
21.3 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
4,677
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,571,000
Total Project Cost
$6,128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.