I-10 WB TO US 90 over US 90

EAST TUNNEL INTERCHANGE · County 097, Alabama · Built 1973 · 1 Lanes · 7,488 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
010855
Year Built
1973
Length
384 m (1259.8 ft)
Max Span
18.3 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
7,488
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,374,000
Total Project Cost
$8,111,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.