I-10 EB TO US 90 over US 90

EAST TUNNEL INTERCHANGE · County 097, Alabama · Built 1973 · 1 Lanes · 4,902 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
010852
Year Built
1973
Length
197.8 m (649 ft)
Max Span
18.3 m
Width
7.7 m (25.3 ft)
Lanes
1
Daily Traffic
4,902
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,484,000
Total Project Cost
$3,832,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.