US 90 TO I10 WB over I-10EB * WB * WB ON RAMP

EAST TUNNEL INTERCHANGE · County 097, Alabama · Built 1973 · 1 Lanes · 4,851 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
010854
Year Built
1973
Length
352.3 m (1155.8 ft)
Max Span
16.5 m
Width
7.7 m (25.3 ft)
Lanes
1
Daily Traffic
4,851
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,040,000
Total Project Cost
$6,644,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.