US 90 WB over TENSAW/SPANISH RIVER
MOBILE - BALD CO LINE · County 097, Alabama · Built 1965 · 2 Lanes · 13,355 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
30.68495, -88.010467
This bridge is in worse condition than 97.9% of bridges in County 097. The average bridge in Alabama is 0 years old; this one is 61 years old.
Nearby Bridges
US 90 EB over TENSAW/SPANISH RIVER
Built 1998
I-10 EB over MOBILE BAY * US 90
Built 1978
I-10 WB over M. BAY 90 98 I10WB RAMP
Built 1978
US 90 over MUD CREEK
Built 1928
US 90 TO I10 WB over I-10EB * WB * WB ON RAMP
Built 1973
I-10 EB TO US 90 over US 90
Built 1973
US 90 EB TO I10 EB over US 90 EB * WB
Built 1973
I-10 WB TO US 90 over US 90
Built 1973
DUNLAP DRIVE over PINTO PASS
Built 2020
US 90 EB TO I10 EB over US 90
Built 1978
Bridge Details
- Structure #
- 008714
- Year Built
- 1965
- Length
- 442.6 m (1452.1 ft)
- Max Span
- 61.6 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 13,355
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,014,000
- Total Project Cost
- $11,015,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.