I-10WB TO WATER ST over I10-EB/WB/RAMP TO WB I10

WEST TUNNEL INTERCHANGE · County 097, Alabama · Built 1972 · 1 Lanes · 4,065 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
010665
Year Built
1972
Length
359.4 m (1179.1 ft)
Max Span
24.4 m
Width
8.7 m (28.5 ft)
Lanes
1
Daily Traffic
4,065
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,900,000
Total Project Cost
$7,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.