3 RD NW over WEST CANAL
3 NW 1 West of SR 281 · County 025, Washington · Built 2002 · 2 Lanes · 96 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.132175, -119.874831
This bridge is in worse condition than 12.2% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 24 years old.
Nearby Bridges
3 RD NW over IRRIGATION LATERAL
Built 1952
MAINTENANCE ROAD over WEST CANAL W39.9
Built 1950
MAINTENANCE ROAD over WEST CANAL W39.9
Built 2016
WHITE TRAIL over LAT 39.9 BLK 75
Built 1994
2 RD NW over IRRIGATION LATERAL
Built 1952
WHITETRAIL RD over WEST CANAL BLK 75
Built 1997
BEVERLY BURKE RD over WEST CANAL BLK 77
Built 1987
3 RD NW over IRRIGATION LATERAL
Built 1952
P ROAD NW over LAT W39.9E2 BLK 75
Built 1952
I-90 over SR 281 SPUR
Built 1962
Bridge Details
- Structure #
- 086738000000000
- Year Built
- 2002
- Length
- 32.6 m (107 ft)
- Max Span
- 32.3 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 96
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,112,000
- Total Project Cost
- $4,224,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.