3 RD NW over IRRIGATION LATERAL
3 NW 0.03 East of SR 281 · County 025, Washington · Built 1952 · 2 Lanes · 110 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.132175, -119.853058
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 74 years old.
Nearby Bridges
MAINTENANCE ROAD over WEST CANAL W39.9
Built 1950
3 RD NW over WEST CANAL
Built 2002
MAINTENANCE ROAD over WEST CANAL W39.9
Built 2016
2 RD NW over IRRIGATION LATERAL
Built 1952
3 RD NW over IRRIGATION LATERAL
Built 1952
P ROAD NW over LAT W39.9E2 BLK 75
Built 1952
WHITE TRAIL over LAT 39.9 BLK 75
Built 1994
I-90 over SR 281 SPUR
Built 1962
I-90 over SR 281 SPUR
Built 1962
BEVERLY BURKE RD over WEST CANAL BLK 77
Built 1987
Bridge Details
- Structure #
- 082225000000000
- Year Built
- 1952
- Length
- 8.5 m (27.9 ft)
- Max Span
- 8.2 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 110
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $686,000
- Total Project Cost
- $1,372,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.