P ROAD NW over LAT W39.9E2 BLK 75
P NW 0.4 S of 5 NW · County 025, Washington · Built 1952 · 2 Lanes · 274 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.156258, -119.832378
This bridge is in worse condition than 65.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 74 years old.
Nearby Bridges
MAINTENANCE ROAD over WEST CANAL W39.9
Built 2016
MAINTENANCE ROAD over WEST CANAL W39.9
Built 1950
3 RD NW over IRRIGATION LATERAL
Built 1952
3 RD NW over IRRIGATION LATERAL
Built 1952
WHITE TRAIL over LAT 39.9 BLK 75
Built 1994
3 RD NW over WEST CANAL
Built 2002
2 RD NW over IRRIGATION LATERAL
Built 1952
WHITETRAIL RD over WEST CANAL BLK 75
Built 1997
R RD NW over IRRIGATION LATERAL
Built 1951
7 NW over West Canal
Built 2004
Bridge Details
- Structure #
- 081005000000000
- Year Built
- 1952
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.8 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 274
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $722,000
- Total Project Cost
- $1,444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.