WHITETRAIL RD over WEST CANAL BLK 75
5 NW 1.1 W of R · County 025, Washington · Built 1997 · 2 Lanes · 5,128 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.160186, -119.897436
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 29 years old.
Nearby Bridges
WHITE TRAIL over LAT 39.9 BLK 75
Built 1994
3 RD NW over WEST CANAL
Built 2002
MAINTENANCE ROAD over WEST CANAL W39.9
Built 2016
7 NW over West Canal
Built 2004
R RD NW over IRRIGATION LATERAL
Built 1951
MAINTENANCE ROAD over WEST CANAL W39.9
Built 1950
3 RD NW over IRRIGATION LATERAL
Built 1952
8 RD NW over WEST CANAL
Built 1953
P ROAD NW over LAT W39.9E2 BLK 75
Built 1952
S RD NW over IRRIGATION LATERAL
Built 1953
Bridge Details
- Structure #
- 086535000000000
- Year Built
- 1997
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,128
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $902,000
- Total Project Cost
- $1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.