2 RD NW over IRRIGATION LATERAL

2 NW .2 W of P-NW · County 025, Washington · Built 1952 · 2 Lanes · 346 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
082724000000000
Year Built
1952
Length
8.2 m (26.9 ft)
Max Span
7.9 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
346
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$668,000
Total Project Cost
$1,336,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.