BEVERLY BURKE RD over WEST CANAL BLK 77
BEVERLY BURKE @ 1 NW · County 025, Washington · Built 1987 · 2 Lanes · 1,452 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
47.097247, -119.862728
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 39 years old.
Nearby Bridges
I-90 over WEST CANAL
Built 1964
I-90 over WEST CANAL
Built 1964
SO. FRONTAGE RD. over WEST CANAL
Built 1950
SR 281 over WEST CANAL
Built 1964
SR 281 over I-90
Built 1964
I-90 over SR 281 SPUR
Built 1962
I-90 over SR 281 SPUR
Built 1962
BEVERLY BURKE RD over I-90
Built 1964
2 RD NW over IRRIGATION LATERAL
Built 1952
Q SW over WEST CANAL BLK 78
Built 1993
Bridge Details
- Structure #
- 084257000000000
- Year Built
- 1987
- Length
- 30.2 m (99.1 ft)
- Max Span
- 29.9 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,452
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,968,000
- Total Project Cost
- $3,935,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.