I-90 over SR 281 SPUR

14.0 E JCT SR 26 · County 025, Washington · Built 1962 · 2 Lanes · 6,917 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
0006858B0000000
Year Built
1962
Length
46.9 m (153.9 ft)
Max Span
18.3 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
6,917
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,500,000
Total Project Cost
$2,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.