POMONA RD. E. over ROZA CANAL
0.30 W. OF SR 821 · County 077, Washington · Built 1996 · 2 Lanes · 160 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
46.68995, -120.483367
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 30 years old.
Nearby Bridges
SR 821 over ROZA CANAL
Built 1969
SR 823 over SLOUGH & CNTY RD
Built 1947
I-82 over ROZA CANAL
Built 1969
I-82 over ROZA CANAL
Built 1969
SR 823 over YAKIMA RIVER
Built 1972
SR 823 over YAKIMA RIVER
Built 1947
SR 821 over I-82
Built 1969
SR 823 over BNSF RAILROAD
Built 1972
SR 823 over BN RR
Built 1947
FIRING CENTER ROAD over ROZA CANAL
Built 1960
Bridge Details
- Structure #
- 086271000000000
- Year Built
- 1996
- Length
- 33.5 m (109.9 ft)
- Max Span
- 31.7 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 160
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,166,000
- Total Project Cost
- $4,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.