SR 821 over ROZA CANAL
0.1 N JCT SR 823 · County 077, Washington · Built 1969 · 2 Lanes · 3,895 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.682239, -120.480497
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 57 years old.
Nearby Bridges
I-82 over ROZA CANAL
Built 1969
I-82 over ROZA CANAL
Built 1969
SR 821 over I-82
Built 1969
SR 823 over SLOUGH & CNTY RD
Built 1947
FIRING CENTER ROAD over ROZA CANAL
Built 1960
SR 823 over YAKIMA RIVER
Built 1972
POMONA RD. E. over ROZA CANAL
Built 1996
SELAH RD. E. over SELAH-MOXEE CANAL
Built 1973
SR 823 over YAKIMA RIVER
Built 1947
SR 823 over BN RR
Built 1947
Bridge Details
- Structure #
- 0008560B0000000
- Year Built
- 1969
- Length
- 29.3 m (96.1 ft)
- Max Span
- 27.7 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 3,895
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $912,000
- Total Project Cost
- $1,824,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.