SR 821 over I-82
JCT I-82 · County 077, Washington · Built 1969 · 3 Lanes · 5,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.677694, -120.480939
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 57 years old.
Nearby Bridges
SELAH RD. E. over SELAH-MOXEE CANAL
Built 1973
FIRING CENTER ROAD over ROZA CANAL
Built 1960
SR 821 over ROZA CANAL
Built 1969
I-82 over ROZA CANAL
Built 1969
I-82 over ROZA CANAL
Built 1969
SR 823 over SLOUGH & CNTY RD
Built 1947
SR 823 over YAKIMA RIVER
Built 1972
SR 823 over YAKIMA RIVER
Built 1947
SR 823 over BNSF RAILROAD
Built 1972
SR 823 over BN RR
Built 1947
Bridge Details
- Structure #
- 0008560A0000000
- Year Built
- 1969
- Length
- 85.3 m (279.9 ft)
- Max Span
- 28.7 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 3
- Daily Traffic
- 5,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,458,000
- Total Project Cost
- $6,916,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.