SR 823 over SLOUGH & CNTY RD
0.2 N JCT I-82 · County 077, Washington · Built 1947 · 2 Lanes · 15,105 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
46.680103, -120.487269
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 79 years old.
Nearby Bridges
SR 823 over YAKIMA RIVER
Built 1972
SR 823 over YAKIMA RIVER
Built 1947
SR 821 over I-82
Built 1969
SR 821 over ROZA CANAL
Built 1969
SELAH RD. E. over SELAH-MOXEE CANAL
Built 1973
SR 823 over BNSF RAILROAD
Built 1972
SR 823 over BN RR
Built 1947
I-82 over ROZA CANAL
Built 1969
I-82 over ROZA CANAL
Built 1969
FIRING CENTER ROAD over ROZA CANAL
Built 1960
Bridge Details
- Structure #
- 0003209B0000000
- Year Built
- 1947
- Length
- 54.3 m (178.1 ft)
- Max Span
- 17.1 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 15,105
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,268,000
- Total Project Cost
- $2,536,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.