SR 823 over YAKIMA RIVER

4.2 N JCT I-82 · County 077, Washington · Built 1972 · 2 Lanes · 5,013 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

46.679314, -120.491222

This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 54 years old.

Nearby Bridges

Bridge Details

Structure #
084066000000000
Year Built
1972
Length
141.1 m (462.9 ft)
Max Span
45.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
5,013
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,738,000
Total Project Cost
$7,477,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.