SR 823 over YAKIMA RIVER

0.1 N JCT I-82 · County 077, Washington · Built 1947 · 2 Lanes · 2,678 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

46.679278, -120.492436

This bridge is in worse condition than 58.9% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 79 years old.

Nearby Bridges

Bridge Details

Structure #
0003209A0000000
Year Built
1947
Length
102.1 m (335 ft)
Max Span
26.5 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
2,678
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,342,000
Total Project Cost
$6,683,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.