SR 823 over BN RR
0.4 N JCT I-82 · County 077, Washington · Built 1947 · 2 Lanes · 15,105 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
46.678989, -120.498483
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 79 years old.
Nearby Bridges
SR 823 over BNSF RAILROAD
Built 1972
SR 823 over YAKIMA RIVER
Built 1947
SR 823 over YAKIMA RIVER
Built 1972
SR 823 over SLOUGH & CNTY RD
Built 1947
SR 821 over I-82
Built 1969
SELAH RD. E. over SELAH-MOXEE CANAL
Built 1973
SR 821 over ROZA CANAL
Built 1969
POMONA RD. E. over ROZA CANAL
Built 1996
I-82 over ROZA CANAL
Built 1969
I-82 over ROZA CANAL
Built 1969
Bridge Details
- Structure #
- 0003346A0000000
- Year Built
- 1947
- Length
- 105.2 m (345.1 ft)
- Max Span
- 24.4 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 15,105
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,442,000
- Total Project Cost
- $6,883,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.