I-80 (SR-80) WBL over SR-195NB Ramp to I-80WB

_ · County 035, Utah · Built 2010 · 3 Lanes · 88,840 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4F 793
Year Built
2010
Length
24.8 m (81.4 ft)
Max Span
24.4 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
88,840
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.