SR-186 SBL. over I-215 (SR-215) EB AND WB
PARLEYS INTERCHANGE · County 035, Utah · Built 1967 · 2 Lanes · 18,995 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
40.71195, -111.804406
This bridge is in worse condition than 37.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 59 years old.
Nearby Bridges
SR-186 FOOTHILL DR over I-80 (SR-80) EBL AND WB
Built 1966
SR-186 FOOTHILL DR over PARLEYS WAY WB.RAMP
Built 1966
RAMP I80W TO I215S over I-215 (SR-215) NBL &
Built 1966
I-80(SR-80)EBL over SR-215(SR-215)WBL
Built 1967
RP.I80WB TO I2155S over I-80 (SR-80) AND WB
Built 1964
I-80 (SR-80) WBL over SR-195NB Ramp to I-80WB
Built 2010
SR-171 3300 SOUTH over I-215 NB AND SB
Built 2008
I-80 (SR-80) EBL over 2300 E.NB RAMP to I-80WB
Built 2010
I-80 (SR-80) EBL over 2000 EAST STREET
Built 2022
I-215 (SR-215) SB over 3760 SOUTH STREET
Built 2004
Bridge Details
- Structure #
- 3C 423
- Year Built
- 1967
- Reconstructed
- 2017
- Length
- 108.4 m (355.6 ft)
- Max Span
- 30.5 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 18,995
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.