SR-186 FOOTHILL DR over PARLEYS WAY WB.RAMP
MOUTH OF PARLEYS CANYON · County 035, Utah · Built 1966 · 4 Lanes · 18,995 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
40.716864, -111.808953
This bridge is in worse condition than 79.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 60 years old.
Nearby Bridges
SR-186 FOOTHILL DR over I-80 (SR-80) EBL AND WB
Built 1966
SR-186 SBL. over I-215 (SR-215) EB AND WB
Built 1967
I-80(SR-80)EBL over SR-215(SR-215)WBL
Built 1967
I-80 (SR-80) WBL over SR-195NB Ramp to I-80WB
Built 2010
I-80 (SR-80) EBL over 2300 E.NB RAMP to I-80WB
Built 2010
RAMP I80W TO I215S over I-215 (SR-215) NBL &
Built 1966
RP.I80WB TO I2155S over I-80 (SR-80) AND WB
Built 1964
I-80 (SR-80) EBL over 2000 EAST STREET
Built 2022
I-80 (SR-80) WBL over 2000 EAST STREET
Built 2022
SR-171 3300 SOUTH over I-215 NB AND SB
Built 2008
Bridge Details
- Structure #
- 0F 52
- Year Built
- 1966
- Length
- 51.6 m (169.3 ft)
- Max Span
- 17.2 m
- Width
- 24.2 m (79.4 ft)
- Lanes
- 4
- Daily Traffic
- 18,995
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.