I-80 (SR-80) WBL over 2000 EAST STREET

2400 SO. & 2000 EAST · County 035, Utah · Built 2022 · 3 Lanes · 88,840 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
4F 942
Year Built
2022
Length
31.3 m (102.7 ft)
Max Span
30.1 m
Width
23.7 m (77.8 ft)
Lanes
3
Daily Traffic
88,840
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.