1300 EAST over PARLEYS TRAIL
1300 E OVER PARLEYS TRAIL · County 035, Utah · Built 2014 · 7 Lanes · 50,120 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
40.724506, -111.853817
This bridge is in worse condition than 37.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 12 years old.
Nearby Bridges
I-80WB (SR-80) over HIGHLAND DRIVE in SLC
Built 2008
1300E over I-80
Built 2023
I-80 (SR-80) EBL over HIGHLAND DRIVE in SLC
Built 2008
I-80EB OFF-RAMP over HIGHLAND DRIVE
Built 2010
I-80WB (SR-80) over 900 EAST STREET in SLC
Built 2008
I-80 (SR-80) EBL over 900 EAST STREET in SLC
Built 2008
1700 E over I-80
Built 2022
I-80WB (SR-80) over SR-71 700 EAST ST.
Built 2008
I-80 (SR-80) EBL over SR-71 700 EAST ST.in SLC
Built 2008
I-80WB ON-RAMP over 600 EAST STREET in SLC
Built 2008
Bridge Details
- Structure #
- 035205E
- Year Built
- 2014
- Length
- 8.4 m (27.6 ft)
- Max Span
- 7.5 m
- Width
- 41.3 m (135.5 ft)
- Lanes
- 7
- Daily Traffic
- 50,120
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.