I-80 (SR-80) EBL over HIGHLAND DRIVE in SLC

2400 South Highland Drive · County 035, Utah · Built 2008 · 4 Lanes · 107,885 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2C 963
Year Built
2008
Length
43 m (141.1 ft)
Max Span
41.8 m
Width
22.8 m (74.8 ft)
Lanes
4
Daily Traffic
107,885
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.