1700 E over I-80
1700 E and I-80 · County 035, Utah · Built 2022 · 2 Lanes · 5,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.7184, -111.842
This bridge is in worse condition than 19.5% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 4 years old.
Nearby Bridges
I-80 (SR-80) WBL over 2000 EAST STREET
Built 2022
I-80 (SR-80) EBL over 2000 EAST STREET
Built 2022
1300E over I-80
Built 2023
1300 EAST over PARLEYS TRAIL
Built 2014
I-80WB (SR-80) over HIGHLAND DRIVE in SLC
Built 2008
I-80EB OFF-RAMP over HIGHLAND DRIVE
Built 2010
I-80 (SR-80) EBL over HIGHLAND DRIVE in SLC
Built 2008
I-80 (SR-80) EBL over 2300 E.NB RAMP to I-80WB
Built 2010
I-80 (SR-80) WBL over SR-195NB Ramp to I-80WB
Built 2010
I-80WB (SR-80) over 900 EAST STREET in SLC
Built 2008
Bridge Details
- Structure #
- 0C1085
- Year Built
- 2022
- Length
- 52.4 m (171.9 ft)
- Max Span
- 51.5 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 2
- Daily Traffic
- 5,600
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.