I-80 (SR-80) EBL over 2300 E.NB RAMP to I-80WB
At 2300 E. Int.with I-80 · County 035, Utah · Built 2010 · 3 Lanes · 88,840 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
40.713075, -111.822731
This bridge is in worse condition than 37.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 16 years old.
Nearby Bridges
I-80 (SR-80) WBL over SR-195NB Ramp to I-80WB
Built 2010
I-80(SR-80)EBL over SR-215(SR-215)WBL
Built 1967
I-80 (SR-80) EBL over 2000 EAST STREET
Built 2022
I-80 (SR-80) WBL over 2000 EAST STREET
Built 2022
SR-186 FOOTHILL DR over PARLEYS WAY WB.RAMP
Built 1966
SR-186 FOOTHILL DR over I-80 (SR-80) EBL AND WB
Built 1966
SR-186 SBL. over I-215 (SR-215) EB AND WB
Built 1967
1700 E over I-80
Built 2022
RAMP I80W TO I215S over I-215 (SR-215) NBL &
Built 1966
1300E over I-80
Built 2023
Bridge Details
- Structure #
- 2F 793
- Year Built
- 2010
- Length
- 24.8 m (81.4 ft)
- Max Span
- 24.4 m
- Width
- 22.4 m (73.5 ft)
- Lanes
- 3
- Daily Traffic
- 88,840
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.