SR-186 FOOTHILL DR over I-80 (SR-80) EBL AND WB
MOUTH OF PARLEYS CANYON · County 035, Utah · Built 1966 · 5 Lanes · 18,995 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.714075, -111.806433
This bridge is in worse condition than 99.1% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 60 years old.
Nearby Bridges
SR-186 SBL. over I-215 (SR-215) EB AND WB
Built 1967
SR-186 FOOTHILL DR over PARLEYS WAY WB.RAMP
Built 1966
I-80(SR-80)EBL over SR-215(SR-215)WBL
Built 1967
RAMP I80W TO I215S over I-215 (SR-215) NBL &
Built 1966
I-80 (SR-80) WBL over SR-195NB Ramp to I-80WB
Built 2010
I-80 (SR-80) EBL over 2300 E.NB RAMP to I-80WB
Built 2010
RP.I80WB TO I2155S over I-80 (SR-80) AND WB
Built 1964
SR-171 3300 SOUTH over I-215 NB AND SB
Built 2008
I-80 (SR-80) EBL over 2000 EAST STREET
Built 2022
I-80 (SR-80) WBL over 2000 EAST STREET
Built 2022
Bridge Details
- Structure #
- 0C 422
- Year Built
- 1966
- Reconstructed
- 2000
- Length
- 98.1 m (321.9 ft)
- Max Span
- 28.4 m
- Width
- 24.7 m (81 ft)
- Lanes
- 5
- Daily Traffic
- 18,995
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.