PERIMETER RD. over EL TORO CREEK
SE OF HWY 28 · County 061, Puerto Rico · Built 1947 · 1 Lanes · 10 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
18.419, -66.128019
This bridge is in worse condition than 60.3% of bridges in County 061. The average bridge in Puerto Rico is 0 years old; this one is 79 years old.
Nearby Bridges
COLUMBUS ST. over EL TORO CREEK
Built 1985
PR 22 over MALARIA CREEK
Built 1971
PR 22 over OIL PIPE LINES
Built 1971
PR 22 over DRAINAGE DITCH
Built 1971
PR 22 over DRAINAGE DITCH
Built 1971
PR 5 1.6 KM over PR 28 0.01 KM
Built 1975
PR 22 over PR 28
Built 1971
PR 22 over PR 5
Built 1971
RAMP PR 22 TO PR 5 over PR 5
Built 1971
PR 22 de Ramp PR 5 over PR-5 KM 7.20
Built 2003
Bridge Details
- Structure #
- DAPASOBUC00C009
- Year Built
- 1947
- Length
- 7.5 m (24.6 ft)
- Max Span
- 3.7 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Culvert
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.