PR 5 1.6 KM over PR 28 0.01 KM

2 KM NORTHEAST OF BAYAMON · County 021, Puerto Rico · Built 1975 · 2 Lanes · 9,350 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
014322
Year Built
1975
Length
56.4 m (185 ft)
Max Span
22.7 m
Width
26.6 m (87.3 ft)
Lanes
2
Daily Traffic
9,350
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$450,000
Total Project Cost
$676,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.