PR 22 over OIL PIPE LINES
1.1 KM E INT PR22 & P · County 033, Puerto Rico · Built 1971 · 6 Lanes · 104,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.422717, -66.130033
This bridge is in worse condition than 12.5% of bridges in County 033. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
PR 22 over DRAINAGE DITCH
Built 1971
PR 22 over MALARIA CREEK
Built 1971
PERIMETER RD. over EL TORO CREEK
Built 1947
PR 22 over DRAINAGE DITCH
Built 1971
COLUMBUS ST. over EL TORO CREEK
Built 1985
PR 5 over BUCHANNAN CHANNEL
Built 1943
PR 5 1.6 KM over PR 28 0.01 KM
Built 1975
PR 22 over PR 5
Built 1971
RAMP PR 22 TO PR 5 over PR 5
Built 1971
PR 22 de Ramp PR 5 over PR-5 KM 7.20
Built 2003
Bridge Details
- Structure #
- 011791
- Year Built
- 1971
- Length
- 13.6 m (44.6 ft)
- Max Span
- 12.4 m
- Width
- 35 m (114.8 ft)
- Lanes
- 6
- Daily Traffic
- 104,500
- Material
- Concrete
- Design
- Slab
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $81,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.