COLUMBUS ST. over EL TORO CREEK

NEAR BLDG 539 · County 061, Puerto Rico · Built 1985 · 2 Lanes · 3,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
DAPASOBUC000542
Year Built
1985
Length
7.7 m (25.3 ft)
Max Span
2.4 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
3,000
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.