PR 22 over MALARIA CREEK
3 KM E INT PR 22 & PR · County 033, Puerto Rico · Built 1971 · 6 Lanes · 104,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.422611, -66.12885
This bridge is in worse condition than 37.5% of bridges in County 033. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
PR 22 over OIL PIPE LINES
Built 1971
PR 22 over DRAINAGE DITCH
Built 1971
PERIMETER RD. over EL TORO CREEK
Built 1947
COLUMBUS ST. over EL TORO CREEK
Built 1985
PR 22 over DRAINAGE DITCH
Built 1971
PR 5 over BUCHANNAN CHANNEL
Built 1943
PR 5 1.6 KM over PR 28 0.01 KM
Built 1975
PR 22 over PR 5
Built 1971
RAMP PR 22 TO PR 5 over PR 5
Built 1971
PR 22 de Ramp PR 5 over PR-5 KM 7.20
Built 2003
Bridge Details
- Structure #
- 011781
- Year Built
- 1971
- Length
- 39.5 m (129.6 ft)
- Max Span
- 10.6 m
- Width
- 35.1 m (115.2 ft)
- Lanes
- 6
- Daily Traffic
- 104,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $2,696,000
- Total Project Cost
- $3,370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.