PR 22 over DRAINAGE DITCH

1 KM EAST FROM INT PR 167 · County 033, Puerto Rico · Built 1971 · 6 Lanes · 104,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011801
Year Built
1971
Length
28.6 m (93.8 ft)
Max Span
10.9 m
Width
35 m (114.8 ft)
Lanes
6
Daily Traffic
104,500
Material
Concrete Continuous
Design
Slab
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$1,952,000
Total Project Cost
$2,440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.