PR 22 over DRAINAGE DITCH
2 KM SOUTH WEST OF CATA&# · County 033, Puerto Rico · Built 1971 · 6 Lanes · 104,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.422806, -66.135461
This bridge is in worse condition than 37.5% of bridges in County 033. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
PR 22 over DRAINAGE DITCH
Built 1971
PR 5 1.6 KM over PR 28 0.01 KM
Built 1975
PR 22 over PR 5
Built 1971
RAMP PR 22 TO PR 5 over PR 5
Built 1971
PR 22 over OIL PIPE LINES
Built 1971
PR 22 de Ramp PR 5 over PR-5 KM 7.20
Built 2003
PR 22 over MALARIA CREEK
Built 1971
RAMP PR 22 TO PR 5 over PR 22
Built 1971
PR 5 PR 22 16.8 KM over PR 5 PR 22
Built 2012
PR 5 over BUCHANNAN CHANNEL
Built 1943
Bridge Details
- Structure #
- 011811
- Year Built
- 1971
- Length
- 30.1 m (98.8 ft)
- Max Span
- 11.2 m
- Width
- 35.3 m (115.8 ft)
- Lanes
- 6
- Daily Traffic
- 104,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $319,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.