AMRCO MIRDA 2.2 KM over JOSEFINA CREEK
REPARTO METROPOLITANO RP · County 127, Puerto Rico · Built 1950 · 2 Lanes · 20,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.401333, -66.076608
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 76 years old.
Nearby Bridges
AMRCO MRNDA 1.6 KM over DOÑA ANA CREEK
Built 1950
31 S.E. STREET over JOSEFINA CREEK
Built 1964
29 ST S.E 0.1 KM over DO¥A ANA CREEK
Built 1955
ANDALCIA ST 0.1 KM over JOSEFINA CREEK KM 0.1
Built 1950
21 STREET 0.01 KM over JOSEFINA CREEK
Built 1940
21 ST 0.1 KM over DOÑA ANA CREEK
Built 1960
PR 18 3.35 KM over AVE. AMER MIRANDA 1.4 KM
Built 1967
PR 17 (PI¥ERO over JOSEFINA CREEK
Built 1950
9 S.E. STREET over JOSEFINA CREEK
Built 1950
PR 18 2.6 KM over PR 17 4.0 KM
Built 1967
Bridge Details
- Structure #
- 021041
- Year Built
- 1950
- Length
- 9.9 m (32.5 ft)
- Max Span
- 3.1 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 2
- Daily Traffic
- 20,500
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $363,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.