PR 18 3.35 KM over AVE. AMER MIRANDA 1.4 KM

AT SJ MED CENTER ENTRANCE · County 127, Puerto Rico · Built 1967 · 6 Lanes · 261,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
010051
Year Built
1967
Length
75.1 m (246.4 ft)
Max Span
21.9 m
Width
27.9 m (91.5 ft)
Lanes
6
Daily Traffic
261,400
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,933,000
Total Project Cost
$3,520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.