AMRCO MRNDA 1.6 KM over DOÑA ANA CREEK
REPARTO METROPOLITANO RP · County 127, Puerto Rico · Built 1950 · 2 Lanes · 20,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.401344, -66.077781
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 76 years old.
Nearby Bridges
29 ST S.E 0.1 KM over DO¥A ANA CREEK
Built 1955
AMRCO MIRDA 2.2 KM over JOSEFINA CREEK
Built 1950
31 S.E. STREET over JOSEFINA CREEK
Built 1964
21 ST 0.1 KM over DOÑA ANA CREEK
Built 1960
21 STREET 0.01 KM over JOSEFINA CREEK
Built 1940
ANDALCIA ST 0.1 KM over JOSEFINA CREEK KM 0.1
Built 1950
PR 17 (PI¥ERO over JOSEFINA CREEK
Built 1950
PR 18 3.35 KM over AVE. AMER MIRANDA 1.4 KM
Built 1967
9 S.E. STREET over JOSEFINA CREEK
Built 1950
DE DIEGO AVENUE over DO%A ANA CREEK
Built 1955
Bridge Details
- Structure #
- 021051
- Year Built
- 1950
- Length
- 13.3 m (43.6 ft)
- Max Span
- 3.9 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 2
- Daily Traffic
- 20,300
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $89,000
- Total Project Cost
- $134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.